Complete Safety Rebuild
Includes:
Full demolition of bathroom wall substrates
Complete continuous waterproofing system (signature method)
New wall substrates + tile installation
Slip-resistant shower floor + bathroom floor tile
Plumbing upgrades (as needed within layout)
Electrical upgrades (lighting + code compliance)
Blocking installed for 3 grab bars
Installation of 3 standard grab bars
Tile-ready shower system (no prefab look)
Shower niche (standard)
Sliding glass shower door (standard)
Standard vanity + faucet + toilet
Standard lighting package
Full apartment cleaning post-job
Timeline: ~3–7 weeks